"A variety of cargo pants for different genders, colors, materials, styles and styles"
"A variety of cargo pants for different genders, colors, materials, styles and styles" "A variety of cargo pants for different genders, colors, materials, styles and styles"
Cart(0)
Home Styles Modern Styles
Capri Jeans for Women Stretch Low Rise Ripped Denim Capris Boyfriend Distressed Skinny Jeans with Pockets Cropped Pants
Capri Jeans for Women Stretch Low Rise Ripped Denim Capris Boyfriend Distressed Skinny Jeans with Pockets Cropped Pants
  • A001-dark Blue
  • A002-light Blue
  • A003-black
  • A004-gray
  • Medium
  • Large
  • X-Large
  • XX-Large
  • Small

$ 12.00

$ 12.00

Please select combo product attributes
The combo subtotal is $,SAVE$
Unavailable

Product Details



    • Material : Denim shorts women are primarily made of cotton and polyester, ensuring the durability and comfort of the womens shorts, elastic and soft, allowing you to wear them multiple times
    • Design Feature:Casual stretchy jean capris feature a low waisted fit, frayed hem, distressed details and four functional pockets. Two slanted front pockets are large enough to carry your cell phone and belongings
    • Match: High waitsed jean shorts are very versatile, you can pair them with various styles of tops, such ad loose shirts, fitted T-shirts, or a lightweight knitted cardigan, or a trendy camisole, which can easily creating different fashion styles
    • OccasionWhether its for daily casual wear, shopping trips, gatherings with friends or vacation travels, these stretchy denim shorts can be your reliable companion. They are suitable for wearing in the hot summer, keeping you cool and comfortable
    • Care TipsPlease wash them with similar colors, MACHINE WASH in cold water, do not bleach, and do not iron


    • Product Dimensions : 9.84 x 7.87 x 0.79 inches; 5.29 ounces
    • Department : womens
    • Date First Available : April 22, 2025
    You May Also Like
    Cart
    "A variety of cargo pants for different genders, colors, materials, styles and styles"
    Your cart is currently empty.